A Smarter Way to Evaluate Schedule Integrity
Score a P6 schedule against the DCMA 14 points and see which method fits the project.
Ready to share the result?
Export the report
How the checks are read. Thresholds follow the DCMA 14-point assessment (DCMA-EA PAM 200.1). Float and duration are converted to working days with each activity's calendar. Planned Finish stands in for the baseline finish, and the critical path test is a static trace of the zero-float chain, not a re-run of the schedule in P6. Use the result to screen, then confirm findings in the source schedule.